HONGYANG GROUP Bulgaria Technical Center

Fax: +86 (577)88097280

HONGYANG Group logo

HONGYANG GROUP Bulgaria Technical Center , Discuss Technical Problem , Suply After Service Online of Fuel Dispenser, Please Regist Firstly

U314 Automatic Nozzle

U314

U314 Automatic Nozzle

U314 Automatic nozzles are designed with today's customer in mind. Small, trim, light weight, easy and convenient to use. It is a rugged performer that offers long life and reliable service.

Warning

Use foreign objects to hold open automatic nozzles could result in failure to shut-off and personal injury.

Materials:

Body: Aluminum

seals: Buna-N, Viton

Main stem seals: Viton Cased Oil Seal / Graphite with Teflon

Main stem: Stainless steel

Color of insulator :

Red Green Blue Yellow Black

Features :

U314-A/C/E/G Flow rate: 0-45 L/m ( (13/16")

U314-B/D/F/H Flow rate: 0-70 L/m (15/16")

Working Pressure: 0.18Mpa

Compound Main valve and bleed poppet

Tight structure, attractive appearance. Minimum pressure Loss and

offer a maximum flow rate

Accurate flow control-

It allows customers to top off their tank to the exact amount that they

want , and it's easy to stop gasoline flow precisely.

Easily replaced rotar y 360 swivel- prevents the hose

from curling up.

Hold-open rack is available for full service applications.

The one hand control means easy setting to flow rate for customer's convenience.

Spout with gear: Making it to be holding on the spout of tank

without hand, improving your efficiency.

Flow-lock: designed to shut-off automatically when the spout is

tripped up, limiting spillage, avoiding accident.

Hand insulator- protect both nozzle and vehicle, and insulates

users' hands.

Available Colors- color chart on inside back cover

Selective splash guard.

100% Factory Tested

Replacement Parts:

Key Description

1 Spout 13/16" & Spout 15/16"

2 Full hand insulator

3 Lever-Guard Lever Assembly

4 Diaphragm Assembly

5 Vac Cap

6 Main Valve

7 Swivel BSPT3/4" & NPT3/4" & BSPT1" & NPT1"

Package:

Net Weight Cross Weight Dimension

18.75kg/case of 15 22kg/case of 15 55x34x42.5cm/case of 15

products links

links

technical archives

    ur kinds of display mode: Mode I: serial BCD display, in which volume 6 digits, money or sales 6 digits, PPU or unit price 4 digits, totally 16 digits are transmitted out in means of serial mode, realizing operation of memory, coding and drive in display. Diagram 3-5: Main display board figure Mode fuel dispenser II: serial display, in which chip transmit 16 digits including volume 6 digits, sales 6 digits and PPU 4 digits, memorizing and driving in display. Mode III and IV: parallel BCD display, in which chip transmits 16 digits codes including volume 6 digits, sales 6 digits and PPU 4 digits by means of parallel, once time one digit, memorizing, coding and driving in display. Most of fuel dispenser manufacturers recently adopt BCD serial mode to design display board, only very few adopt serial display mode. 1638300217170Display board structures are illustrated in Diagram 3-6 and 3-7. Diagram 3-6: LCD display board structure with parallel drive Diagram 3-7: LCD display board structure with serial drive Being a electric component easy to be failed, the hard structure of display board is introduced in detailed. LCD basic principle and working principle Liquid crystal a stable phase between liquid and solid in terms of thermodynamics, characteristic of not only liquidity and continuity under a certain temperature range, but crystal trait ---- long stick molecule, large proportion of width to length, a bridge between the two polarities. LCD Structure illustrated in Diagram 3-8, electrodes are made various letters, number or matrix according to different requirements. Diagram 3-8: Basic structure of LCD 8-segment LCD and drive 8-segment display tube has two drive modes of static and hour-division. Fuel dispenser usually adopt static drive mode. Static drive circuit and wave showed in Diagram 3-9, the drive mode of LCD display is varied from that of LED display. As for LED only need to connect invariable conduct or cut off voltage to control emitting or wink of LED, but for LCD should not connect inv fuel dispenser fuel dispenser

technical specification

    request.   TotalAmount no.   SalesItems: no.   Loyalty: yes.   OriginalTransa fuel dispenser ction: no.   LoyaltyPointsTransfer Transfer points from one card to another:   TotalAmount no.   SalesItems: no.   Loyalty: yes.   OriginalTransaction: no.   PINchange Changing the PIN to a payment card request.   TotalAmount no.   SalesItems: no.   Loyalty: no.   OriginalTransaction: no.   CardActivate Activate card request (put in whitelist):   TotalAmount no.   SalesItems: no.   Loyalty: no.   OriginalTransaction: no.   CardStop Activate card request (put in blacklist):   TotalAmount no.   SalesItems: no.   Loyalty: no.   OriginalTransaction: no.   StoreValueInCard Store amount onto fuel dispenser fuel dispenser

we are committed to create the best workplace, encourage our staffs to put their own personalities into their jobs, and provide them a stage to show themselves.

    r, a new lease for the World Trade Centre must be in place by March 14th. By March 31st, ground must be broken for the World Trade Centre Memorial. By the end of April, Mr Pataki says, workers must start building the Freedom Tower, America s tallest skyscraper. It is a stirring, ambitious agenda—but o fuel dispenser ne that may be delusional. Mr Pataki can set as many deadlines as he likes. Enforcing them is another matter. Bickering over Ground Zero began before the smoke had cleared from the towers collapse. Four and a half years on, the argument is louder than ever. At the beginning of February Michael Bloomberg, New York s mayor, proposed changes to the rebuilding plan. Chuck Schumer, one of New York s two senators and never one to pass up a press conference, offered his own ideas soon afterwards. “We have moved from consensus to cacophony,�Mr Schumer lamented on February 27th. Part of the problem is that no one is in charge the Port Authority of New York and New Jersey owns the 16-acre site; Larry Silverstein, a 74-year-old developer, holds the lease; and a state- and city-appointed board is co- ordinating rebuilding. The governor is merely a referee without a whistle. Design by committee produced a plan that few are happy about. And with no market for the Freedom Tower, there is little impetus to begin construction. The master plan—ostensibly finalised in 2003—calls for four towers. Mr Bloomberg argues that Mr Silverstein should build only two of these, including the Freedom Tower, and cede the rights to the other buildings. The planned 10m square feet of office space is too much, the mayor claims. He also argues that even with insurance proceeds and public subsidies, Mr Silverstein will not have the $7.3 billion needed at a minimum to build the entire site. Better, the mayor says, to give up two towers now rather than later. “Soviet-style confiscation� Mr Silverstein snapped in response. Some property people in New York think the developer s plan to build 10m square feet of of fuel dispenser fuel dispenser